Bouncy Bond Rubber Bonding Installation at a School
The following images show the stages of installing Rubber Bonding at a school.
The start of the contract.
Removal of the existing, exhausted play surfacing.
Grading and levelling.
The Geotextile Membrane is laid and the Rubber Shred bonding commences.
A wonderful, safe surface is created.
The surface is dry within 24 hours of installation.
Clean Clothes! The play area is accessible all year around.